THE COURSE / M12 THE FAB AS A SYSTEM / M12.4
Moving wafers
After this lesson you can:
- Explain why a fab's flow is re-entrant, and why its wafers are moved by machines.
- Follow a lot from tool to tool: the FOUP, the overhead vehicles, the stockers.
- Say what the MES and its dispatch rules decide, and rank lots by critical ratio.
Loading the lesson…
Sources
- S. T. Shikalgar, D. Fronckowiak and E. A. MacNair (IBM), "300mm wafer fabrication line simulation model," Winter Simulation Conference (2002). Products of about 400–600 process steps. An overhead monorail between bays and overhead hoists within them, meeting at stockers at the end of each bay; the interbay vehicle serves only stockers, the intrabay vehicles carry one lot to the tools' load ports. A finished step sends a move request to the material handling, and a move complete comes back. Normal, priority and qualification lots; raising the share of priority wafers lowered throughput; smaller lots raised transport time. Lot release and dispatch rules strongly affect cycle time.
- D. Nazzal and D. A. Bodner, "A simulation-based design framework for automated material handling systems in 300mm fabrication facilities," Winter Simulation Conference (2003). With 300 mm wafers, automation judged inevitable, to make the most of the capital and for the weight and volume of the lot carriers. Intrabay automation moves lots within a bay, interbay among the bays; a material control system coordinates them; stockers are the automated storage. Overhead hoist vehicles hang from ceiling-mounted rails and deliver to and from stocker ports and tools from directly overhead. Studies compare segregated (through-stocker) with unified (tool-to-tool) delivery.
- S. Dauzère-Pérès, C. Yugma, A. Ben Chaabane, L. Rullière and G. Lamiable (Mines Saint-Étienne, STMicroelectronics Crolles), "A study on storage allocation in an automated semiconductor manufacturing facility" (2012). Interbay, intrabay and unified transport. In a non-unified system a lot crossing bays rides three vehicles: to an exit stocker, between the bays' stockers, and from the entrance stocker to the tool; in a unified one, one vehicle. Overhead hoist buffers (unitary stockers) above the machines give fast access; a standard fab can have more than a thousand; big stockers with an inside robot hold several hundred lots. Machines of the same type share a default stocker, since which of them will run a waiting lot is not yet known.
- Entegris, "A300 FOUPs" data sheet (read 26 October 2026). A 25-wafer FOUP: 426 × 355 × 338 mm; 5.4 kg empty, 8.2 kg with wafers; wafers 10 mm apart; for automated or manual handling; purge options.
- Samsung Semiconductor Newsroom, "The Invisible Highways: Tracing the Journey Inside a Semiconductor Fab" (4 September 2025). Hundreds of steps; overhead hoist vehicles on ceiling tracks carry FOUPs to each tool; one vehicle travels about 100 km a day; all a fab's vehicles, tens of millions of kilometres a year.
- O. Rose, "Some issues of the critical ratio dispatch rule in semiconductor manufacturing," Winter Simulation Conference (2002). Some fabs schedule, but the majority run under dispatch rules: rules that use due dates (critical ratio, earliest due date) and rules that do not (first in first out, shortest processing time first). Critical ratio as (due − now) ÷ (1 + total remaining processing time), lowest first; choosing due dates is critical. Low cycle times and on-time delivery conflict: finishing lots on time makes others wait longer.
- M. Gißrau and O. Rose, "Practical assessment of a combined dispatching policy at a high-mix low-volume ASIC facility," Winter Simulation Conference (2013). At X-FAB Dresden: several hundred steps and a re-entrant flow; dispatching common, scheduling hard. FIFO fair with low variability; shortest processing time for throughput; critical ratio for throughput and on-time delivery; earliest due date for on-time delivery; line balance against starved tools; combined with weights. A real-time dispatcher generates each tool's dispatch list and updates priorities as lots move; lists above 3 seconds were not accepted by the operating staff.